Project Progress
Since the beginning of the Fall 2012 Semester, our group has been hard at work developing the HVAC and Washing Machine user interfaces. Below is a list of each member's programming updates.
We have also been making updates to the project documentation. In the past weeks we have made updates to the following:
- Project Plan
- Acknowledgements
- Problem Statement
- Deliverables
- Design Document
- Problem Statement
- Requirements and Specifications
- Design Choices
The first iteration of project will be completed by the week of October 29, when we will begin usability testing. To prepare, we are developing testing instruments (Overall, HVAC, Washing Machine) as well as a testing script by the end of the week (10/26). We will integrate the feeback into our design during the first two weeks of November and then submit our final design at the end of the semester.
Development Progress
- Tamara Bartlett
- Completed Tasks
- 9/28 - Create graph and column fragments in Energy Activity
- 10/7 - Create a random data generator for Energy Activity
- 10/9 - Added option buttons to energy graph
- Tasks in Progress
- Draw and re-draw graphs in Energy Activity
- Associate energy graph with database data
- Update Settings
- Completed Tasks
- Andrew Hoyt
- Completed Tasks
- Create base layout for HVAC Calendar
- Populated ListView in Calendar Day Tab (?)
- Made buttons for Calendar Day Tab
- Link event data example in Calendar Day Tab
- Created a default Day Schedule
- Tasks in Progress
- Link listviews and buttons (?)
- Make custom listview for events
- Add horizontal scrolling to week view
- Improve layout for each day in Calendar Week View
- Add navigation from WeekView to DayView
- Create time grid for MonthView
- Create a view and events for a typical day
- Add navigation from MonthView to WeekView
- Improve layout for Calendar Events
- Create Add/Delete to EventView
- Create data source for storing events
- Completed Tasks
- Katarina Mitchell
- Completed Tasks
- 9/10 - Loaded Stain database from CSV file
- 9/20 - Implemented new Dial Interface
- 9/22 - Created a Stain Menu and added ability to search Stain Database by Fabric type
- 9/22 - Spaced buttons around dial and selected a button from dial spin.
- 9/29 - Select center of dial to switch activities
- 9/29 - Moved dial to its own fragment
- 9/29 - Switched Maintenance and Stain Guides to use fragments
- 10/6 - Compiled data for Maintenance Database CSV file
- 10/14 - Finished creating the stain database
- 10/20 - Added code to load database tables from existing database
- 10/20 - Added search to Stain Guide
- 10/24 - Updated Program class structure as well as Program Database Table
- 10/25 - Updated Progress Activity to display new Program structure
- 10/27 - Added live search to Stain and Maintenance Guides (Created ContentProvider and Loader)
- 10/27 - Condensed CustomProgramActivity to a single view, removed tabbed views, and added new input components
- 10/27 - Added Load Size, Soil Level, and Steam inputs to main screen
- 10/28 - Updated Washer help menu from Toasts to Dialogs
- 10/30 - Added font styles to Washer
- 10/30 - Changed help icon to question mark on Washer
- Tasks in Progress
- Improve graphics on dial interface
- Completed Tasks
- James Rich
- Completed Tasks
- 9/6 - Switched from Google Weather API to Weather Underground API
- 9/10 - Moved weather to fragment layout
- 9/22 - Moved ProgressActivity timer to fragment
- 9/29 - Add progress bar to ProgressActivity
- 10/8 - Create Maintenance Database from CSV file
- 10/8 - Created toggle group for state buttons on HVAC main screen
- 10/22 - Improve Weather Layout and add a longer forecast
- 10/27 - Added Weather Module to Washing Machine
- 10/27 - Moved Washer Progress Screen components to Fragments
- Tasks in Progress
- Move ProgressActivity components to fragments
- Move ProgressActivity fragments to WasherActivity
- Display wash progress state
- Add Weather Module from HVAC to Washing Machine
- Completed Tasks