The human effort breakdown for this project, including the initial estimate, the revised amount (following one semester), and the actual total is detailed in Table 1.2.
There is some significant information that cannot be explained by the
table alone. After approval from the faculty advisor and the Senior Design
Coordinator, it was decided by the team to move up the completion date
from Fall 1999 to Summer 1999. This adjustment was done to accommodate
other interests, namely early graduation for one of the team members. Additionally,
this deadline change suggested a challenge similar to that found in industry
and, in turn, resulted in implementation modifications. These modifications
were necessary to successfully complete the project in 10 weeks instead
of the originally anticipated 16 weeks. For instance, the 20 hours listed
as Actual time spent on PVM Implementation is accurate, however that effort
is of little importance because PVM was not used in the final implementation.
It was decided that utilizing PVM would "cost" more time than available
because of the accelerated pace.
|
|
|
|||
|
|
|
(Spring ’99) |
|
|
|
|
|
|
|
|
| Overhead | ||||
| Team Meetings |
|
|
|
|
| Research |
|
|
|
|
| Deliverables | ||||
| Project Proposal |
|
|
|
|
| Web Page |
|
|
|
|
| Project Poster |
|
|
|
|
| Design Review |
|
|
|
|
| Oral Presentation |
|
|
|
|
| Further Documentation |
|
|
|
|
| Project Development | ||||
| Hardware / OS Configuration |
|
|
|
|
| PVM Implementation |
|
|
|
|
| MPEG Code Evaluation |
|
|
|
|
| Software Design |
|
|
|
|
| Software Implementation |
|
|
|
|
| Software Tests / Benchmarks |
|
|
|
|
| Total |
|
|
|
|